Project Details |
Client |
Architect |
Structural Engineers |
Cost Rs.
Lakhs |
Year |
Theme Pavillion for plast India Exibition at New Delhi. |
Tata Interactive Systems. |
Ideamatrix – Gauri Roy. |
*VVA |
6 |
1996 |
 |
Prefabricated Cabin design as per requirement |
M/s Viral Prefab Industries Pvt. Ltd. |
- |
*VVA |
- |
2002 |
 |
D2O upgrading tower 60m high in TAPP-3 & TAPP-4 at
Tarapur for Nuclear Power Corporation of India Ltd. |
M/s Nicco Corporation Ltd., Kolkata. |
- |
*VVA |
200 |
2002 |
 |
Transmission Tower full scale testing (100m tall) facility at Nagpur. (A539) |
KEC International Limited, Mumbai. |
- |
A.B. Karnik as main consultants with VA |
1500 |
2008 |
 |
Design of pre-fabricated inverted room.(1072) |
Satec Envir Engineering (I) Pvt. Ltd. |
- |
Vadalkar & Associates |
- |
2011 |
 |
Design calculations and load tables for wall panels (1075) |
Lloyd Insulations (I) ltd. |
- |
Vadalkar & Associates |
- |
2011 |
 |
Platform for walkway at Canopy of International airport Mumbai (1082) |
Lloyd Insulations (I) ltd. |
- |
Vadalkar & Associates |
50 |
2012 |
 |
ONGC oil platform extension near Mumbai. (1090) |
Carlton Offshore |
- |
Vadalkar & Associates |
50 |
2012 |
 |
Finite element analysis for crane base made up of steel plates.(1110) |
M/s Raina Engineers |
- |
Vadalkar & Associates |
- |
2013 |
 |
Analysis of RRP Wharf shed for Govt. of Dubai ( 1161) |
Advance FRP – Hemant Bhide |
- |
Vadalkar & Associates |
- |
2014 |